      Our MISION is to supply the best service and quality of our products,
    which will ensure confidence of our business partners.
             Our VISION is to become one of the most referent
          special companies at the market.
   
   
 
Some of our works done

 

Works in progress

PROJECT: DRMNO
INVESTOR: ELEKTROPRIVREDA SRBIJE
VALUE: 150.000.000,00 rsd
DESCRIPTION:

- Construction of primary and secondary installation for connection to heating system app. 27 km
- welding
- babbling
- supplying of materials (tubes)

PROJECT: HERBAL PLANT "PLANTA SPONTANEA", DOBRA
INVESTOR: PLANTA SPONTANEA, DONJI MILANOVAC
DESCRIPTION:

- mechanical works
- electro works
- plumbing and canalization
- clean rooms
- security concept

PROJECT: TERMOKOMANDA TE"KOSTOLAC", KOSTOLAC
INVESTOR: ELEKTROPRIVREDA SRBIJE, TERMOELEKTRANA KOSTOLAC
DESCRIPTION:

- installation for heating and cooling with automatics
- supplying of materials and equipment
- installation testing


WORKS PERFORMED

1. Construction of heating transmitting stations for the connection to the heating system of the city of Pozarevac for 130/75 ° C system, as well as the design of a derived status project for the following facilities:
* Yugoslav Army Garrison Command, sub-station power N=780 kW, 1995;
* Yugoslav Army Club, sub-station power N= 1650 kW, 1995;
* Barrack "Veljko Dugosevic I", sub-station power N= 1650 kW, 1995;
* Barrack "Veljko Dugosevic I", sub-station power N= 3300 kW, 1995;
* Social work centre, sub-station power N= 100 kW, 1996;
* Pioneer Square no. 22, sub-station power N=350 kW, 1997;
* Toplicina St. no. 24, sub-station power N=1300 kW, 1997;
* Sindjeliceva St. no. 4, sub-station power N=780 kW, 1997;
* Branicevska St. no. 22, sub-station power N=2200 kW, 1998;
* Firefighters' station, sub-station power N=800 kW, 1998;
* Svetosavska St. no. 29, sub-station power N=1800 kW, 1998;
* HTS Brdo, sub-station power N=1400 kW, 1999;
* HTS "Stiska", sub-station power N = 600 kW, 2000;
* HTS "Dunavska", sub-station power N = 1000 kW, 2000;
* HTS Brdo-1, sub-station power N = 600 kW, 2002;
* HTS Sumadijska St. no. 10, sub-station power N=600 kW, 2003;
* HTS Primary School "Desanka Maksimovic", sub-station power N=750 kW, 2003;
* HTS "YU BANKA", sub-station power N=200 kW, 2004;
* HTS Primary School "Vuk Karadzic", sub-station power N= 1000 kW, 2004;
* HTS "Nemanje Tomica", sub-station power N= 1900 kW, 2004;
* HTS "Vardarska 13-15", sub-station power N= 580 kW, 2005;

2. Construction of primary and secondary installation for connection to heating system of the city of Pozarevac for 130/75 ° ;C system, as well as the design of a derived status project for the following facilities:
* Yugoslav Army Garrison Command, secondary installation;
* Yugoslav Army Club, secondary installation
* Yugoslav Army Club, external installation u Drinska St.
* Pioneer Square no. 22, secondary installation
* Toplicina St. no. 20 and no. 24, secondary installation
* Sindjeliceva St. no. 4, secondary installation
* Branicevska St. no. 22, secondary installation
* Firefighters' station, secondary installation
* Svetosavska St. no. 29, secondary installation
* HTS Brdo, secondary installation, 1999;
* HTS Brdo-1, secondary installation uPodbrdica, 2002;
* Kostolacka St., secondary installation, 2002;
* B. Prvulovic St., secondary installation, 2002-2003;
* R. Milenica Rusa St., secondary installation, 2002-2003;
* "Stara kasarna" u Old barrack, primary heating line, 2002;
* Vojvode Stepe St. no. 27, secondary installation, 2002;
* Dimitrija Tucovica St. no. 2a, secondary installation, 2002;
* Kosanciceva St., secondary installation, 2002-2003;
* Trscanska St. no. 25 and no. 31, secondary installation, 2002;
* Vardarska St. no. 17 and no. 17a, secondary installation, 2002;
* Bratstva jedinstva St., secondary installation, 2002-2003;
* Filipa Kljajica St. no. 5, secondary installation, 2002;
* Draze Markovica St. No. 14, secondary installation, 2003;
* Yugoslav Army St. no. 121, secondary installation, 2003;
* Kolubarska St. no. 13, no. 15 and no. 17, secondary installation, 2003;
* Sime Simica St., secondary installation, 2003;
* Location "Hrastovaca", secondary installation, 2003;
* "YU BANKA", primary installation, 2004;
* Branicevska St., secondary installation, December 2004;
* Jovana Popovica St., "BRDO 1-1", secondary installation, December 2004;
* Staro Korzo no. 38 (Old promenade) (Service for cash flow accounting), secondary installation, December 2004;
* Porecka St., primary installation, December 2004.

3. Cleaning of oil fuel tanks, design of saving and floor heating unit for oil fuel tanks with volume V = 100 m3, along with the design of condensation groups and equipment for feeding the boilers; technical documentation design, VP 3368, facility: Barrack "Aleksa Dundic" Zemun, 1994;

4. Rehabilitation of oil fuel boiler room in the "Slavija" hotel in Belgrade, 1995;

5. Heating of oil fuel, pouring, cleaning of the tanks with volume of V = 100 m3, design of a new saving and floor heating unit, Fodder factory "Stizanka" Pozarevac, 1995;

6. Reconstruction of the oil fuel boiler room in the "Dr. Dragisa Misovic" hospital in Belgrade, 1997 u cleaning two tanks with volume of V = 50 m3;

7. Reconstruction of the oil fuel boiler room in the "Zeleznicka" hospital in Belgrade, 1997 u cleaning the tank with volume of V = 100 m3;

8. Carrying out the activities in reconstruction of the oil fuel boiler room in "Zastava film" u Kosutnjak, as well as the design of the derived status documentation, MPO 3368, 1998;

9. Replacement of the rear cooling shaft in the steam boiler of the Steambloc optimal type 1200, "PIK" in Kikinda, 1999;

10. Line for the chemical preparation of water in Heating facility of Krusevac, capacity 25-30 m3/h, 1999;

11. Rehabilitation of the secondary installation, "LITAS" Pozarevac, 2000;

12. Rehabilitation and reconstruction of the facility for preparation of sanitary water 2 x 2 m3 in the facility of "Samacki hotel", the investor was "Energoprojekt", 2000;

13. Reconstruction along with construction of a new part of the facility for preparation of hot water N = 72 kW, V = 4000 lit, at the facility of ENJUB-YUBC, the investor was "Energoprojekt", 2000;

14. Rehabilitation of heating boilers S2000, Q = 2 x 2 MW in the boiler room of Railway Transport Enterprise u "ZTP" u 25 May u Zemun, 2001;

15. Design and installation of self-bearing chimneys ° 500 x 15000, "ZTP" u 25 May u Zemun, 2001;

16. Rehabilitation and reconstruction of the facility for central preparation of hot water 2 x 5 m3, "Sports Centre of Zvezdara", 2001;

17. Construction of a boiler room, radiator and calorific heating, "MARBO u plant for potato processing" u Laktasi, 2001;

18. Activities on connecting the court building to the heating system of Pozarevac, 2001;

19. Design and installation of chimneys of ° 520 ° 14255 mm, "ZTP" Begrade, 2001;

20. Reconstruction of the ventilation system of the garage and hall for buses maintenance in "Litas" Pozarevac, 2002;

21. Mechanical operations in heating pipe system, "Telefon kabl" (Telephone Cable) in Belgrade, 2002;

22. Repairs of heating and boiler installations in the boiler room of "Sinkovac" barrack in Leskovac, 2003;

23. Construction of heating-transmitting station, HTS "Pozoriste", with power of N=600 kW, PCE "Toplifikacija" in Sremska Mitrovica, 2003;

24. Replacement of a screen chamber of the TE-109 boiler, "TIGAR" Pirot, October 2003;

25. Installation for central heating in administrative facilities of the watchtower of MPO Doljevac, 2003;

26. Installation of central heating in new housing blocks (3 block sections) in Jugoviceva St. no. 4 in Pozarevac, 2003-2004;

27. Mechanical operations in connecting the building of JUBANKA with heating system of Pozarevac u primary net and HTS 2004;

28. Mechanical operations in replacing floor heater in the oil fuel tank with volume of V= 20.000,00 m3 and heating surface of F=378 m2, "COREKT INZENJERING" Belgrade for NIS NAFTAGAS u PROMET in Novi Sad;

29. Installation for central heating in new housing blocks (Vardarska St. no. 13-15, in Pozarevac, 2004;

30. Reconstruction of boiler installation with power of 2 ° 1047 kW, in "LITAS" in Pozarevac, 2004;

31. Design of ventilation and cooling system for scanner room in the Healthcare Centre in Pozarevac, February 2005;

32. Construction of heating-transmitting stations for connection to heating system of Kostolac for 130/75 ° C system, as well as the design of derived status project for the following facilities:
* Heating-transmitting station HTS B2-1, B2-2, sub-station power of N=3006 kW, March 2005;
* Heating-transmitting station HTS 20, B2-3, B4-1, sub-station power of N=3140 kW, March 2005;
* Heating-transmitting station HTS 18, sub-station power of N=1302 kW, March 2005;
* Heating transmitting station HTS 23, sub-station power of N=524 kW, March 2005.

33. Construction of heating pipe system 130/75 ° C, shank RK103 and RK111 in Kostolac, operation in progress;

34. Production of expansion vessel V= 40 m3, PCE "Beogradske elektrane" TO Banovo brdo, operation in progress;

35. Reparation of cracked pipes of the heat exchanger in the water-air system for climate conditioning of blik thermal command 210 MW, PE TE "KOSTOLAC" in Kostolac, May 2005.

   

done by thedule